πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Betteshanger Colliery

BetteshangerColliery Northbourne Betteshanger near Deal Kent, Kent

Betteshanger Colliery is a 9 MW bioenergy / waste project in South East. The applicant or operator on record is Pyrogen (Kent) Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Dover.…

Withdrawn
Project stageWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2005-08-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

9.000 MW
Registered Capacity

πŸ“‹ Project Overview

Betteshanger Colliery is a 9 MW bioenergy / waste project in South East. The applicant or operator on record is Pyrogen (Kent) Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Dover.

πŸ”§ Technical Specifications

Capacity (MW)9.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPyrogen (Kent) Ltd
Owner / operatorPyrogen (Kent) Ltd
LocationBetteshangerColliery Northbourne Betteshanger near Deal Kent, Kent
RegionSouth East
Coordinates51.2274557Β°N, 1.3443887Β°E

Additional published register fields

Registered technologyEfW Incineration