πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Berry Fen Wind Farm

Berry Fen, Aldreth, Ely, Cambridgeshire, Cambridgeshire

Berry Fen Wind Farm is a 9 MW onshore wind project in Eastern. The applicant or operator on record is REG Windpower. The application has been withdrawn or the scheme abandoned. The determining authority is East Cambridgeshire, reference 14/00728/ESF.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2015-07-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

9.000 MW
Registered Capacity

πŸ“‹ Project Overview

Berry Fen Wind Farm is a 9 MW onshore wind project in Eastern. The applicant or operator on record is REG Windpower. The application has been withdrawn or the scheme abandoned. The determining authority is East Cambridgeshire, reference 14/00728/ESF.

Site Schematic

EASTERN Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)9.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperREG Windpower
Owner / operatorREG Windpower
LocationBerry Fen, Aldreth, Ely, Cambridgeshire, Cambridgeshire
RegionEastern
Coordinates52.3492034Β°N, 0.1108688Β°E

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)3
No. of Turbines3

πŸ“… Project Timeline

2014-06-30