Solar Farm

Belvoir Fruit Farms, Barkestone Lane - Solar Panels

Belvoir Fruit Farms, Barkestone Lane, Bottesford, Nottingham, Nottinghamshire, NG13 0DH

Belvoir Fruit Farms, Barkestone Lane - Solar Panels is a 0.23 MW solar farm project in East Midlands. The applicant or operator on record is Watt Energy Saver Limited. Planning permission has been granted as of December 2025 and it is awaiting construction. The determining author…

Consented / Approved
Project stageConsented
  1. PlanningOct 2025 (completed)
  2. ConsentedDec 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-01-26.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.230 MW
Registered Capacity

πŸ“‹ Project Overview

Belvoir Fruit Farms, Barkestone Lane - Solar Panels is a 0.23 MW solar farm project in East Midlands. The applicant or operator on record is Watt Energy Saver Limited. Planning permission has been granted as of December 2025 and it is awaiting construction. The determining authority is Melton, reference 25/01068/GDOPV.

Site Schematic

SUBSTATION ? ha Β· 0.23 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.230 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWatt Energy Saver Limited
Owner / operatorWatt Energy Saver Limited
Year consented2025
LocationBelvoir Fruit Farms, Barkestone Lane, Bottesford, Nottingham, Nottinghamshire, NG13 0DH
RegionEast Midlands
Coordinates52.928613Β°N, 0.8156086Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-10-09
2025-12-02