Solar Farm

Bellmoor Grassland

Land At Bellmoor Grassland Sutton Cum Lound Retford Notts, Nottinghamshire, DN22 8SB

Bellmoor Grassland is a 5 MW solar farm project in East Midlands. The applicant or operator on record is Fred Walter & Sons Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Bassetlaw, reference 13/01126/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2015-12-18.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Bellmoor Grassland is a 5 MW solar farm project in East Midlands. The applicant or operator on record is Fred Walter & Sons Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Bassetlaw, reference 13/01126/FUL.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFred Walter & Sons Ltd
Owner / operatorFred Walter & Sons Ltd
Year consented2013
LocationLand At Bellmoor Grassland Sutton Cum Lound Retford Notts, Nottinghamshire, DN22 8SB
RegionEast Midlands
Coordinates53.3490135Β°N, 0.9694341Β°W

Additional published register fields

Registered technologySolar Photovoltaics

πŸ“… Project Timeline

2013-10-08
2013-12-21