Solar Farm

Bell Lane Solar Farm

Land At Bell Lane And Opposite, Bell Lane, Shenley, Radlett, Hertfordshire, WD7 9AD

Bell Lane Solar Farm is a 1 MW solar farm project in Eastern. The applicant or operator on record is Mulbrick Cleans Energy. The planning application was refused. The determining authority is Hertsmere, reference 15/1287/FUL.…

Refused
Project stageRefused
  1. PlanningAug 2015 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2015-12-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.000 MW
Registered Capacity

πŸ“‹ Project Overview

Bell Lane Solar Farm is a 1 MW solar farm project in Eastern. The applicant or operator on record is Mulbrick Cleans Energy. The planning application was refused. The determining authority is Hertsmere, reference 15/1287/FUL.

Site Schematic

SUBSTATION ? ha Β· 1 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMulbrick Cleans Energy
Owner / operatorMulbrick Cleans Energy
LocationLand At Bell Lane And Opposite, Bell Lane, Shenley, Radlett, Hertfordshire, WD7 9AD
RegionEastern
Coordinates51.7039375Β°N, 0.2881824Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)50200

πŸ“… Project Timeline

2015-08-27