Beech Tree Farm Wind Turbines

Beech Tree Farm Goveton Kingsbridge TQ7 2DT (Land between Goveton and A381), Devon

Beech Tree Farm Wind Turbines is a 4.9 MW onshore wind project in South West. The applicant or operator on record is Npower Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is South Hams, reference 819/2140/04/F.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 2004 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2005-08-26.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.900 MW
Registered Capacity

πŸ“‹ Project Overview

Beech Tree Farm Wind Turbines is a 4.9 MW onshore wind project in South West. The applicant or operator on record is Npower Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is South Hams, reference 819/2140/04/F.

Site Schematic

SOUTH WEST Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)4.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperNpower Renewables
Owner / operatorNpower Renewables
LocationBeech Tree Farm Goveton Kingsbridge TQ7 2DT (Land between Goveton and A381), Devon
RegionSouth West
Coordinates50.3156493Β°N, 3.753747Β°W

Additional published register fields

Registered technologyWind Onshore

πŸ“… Project Timeline

2004-10-27