Beech Tree Farm
Goveton
Kingsbridge
TQ7 2DT
(Land between Goveton and A381), Devon
Beech Tree Farm Wind Turbines is a 4.9 MW onshore wind project in South West. The applicant or operator on record is Npower Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is South Hams, reference 819/2140/04/F.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningOct 2004 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2005-08-26.
Registered planning capacity; not measured generation.
Beech Tree Farm Wind Turbines is a 4.9 MW onshore wind project in South West. The applicant or operator on record is Npower Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is South Hams, reference 819/2140/04/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
4.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Npower Renewables
Owner / operator
Npower Renewables
Location
Beech Tree Farm
Goveton
Kingsbridge
TQ7 2DT
(Land between Goveton and A381), Devon