π Project Overview
Beddington AD Facility (Waste AD) is a 2 MW bioenergy / waste project in London. The applicant or operator on record is Viridor. The application has been withdrawn or the scheme abandoned. The determining authority is Sutton, reference D2010/62424.
π§ Technical Specifications
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Viridor |
| Owner / operator | Viridor |
| Location | Beddington Lane, Beddington, London, CR0 4TH |
| Region | London |
| Coordinates | 51.3787948Β°N, 0.1333791Β°W |
Additional published register fields
| Registered technology | Anaerobic Digestion |
|---|