Bioenergy / Waste

Beddington AD Facility (Waste AD)

Beddington Lane, Beddington, London, CR0 4TH

Beddington AD Facility (Waste AD) is a 2 MW bioenergy / waste project in London. The applicant or operator on record is Viridor. The application has been withdrawn or the scheme abandoned. The determining authority is Sutton, reference D2010/62424.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningMar 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2017-07-28.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

Beddington AD Facility (Waste AD) is a 2 MW bioenergy / waste project in London. The applicant or operator on record is Viridor. The application has been withdrawn or the scheme abandoned. The determining authority is Sutton, reference D2010/62424.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperViridor
Owner / operatorViridor
LocationBeddington Lane, Beddington, London, CR0 4TH
RegionLondon
Coordinates51.3787948Β°N, 0.1333791Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2010-03-02