π Project Overview
Beckton STW Enhanced Sludge Digestion is a 5.8 MW renewable energy project in London. The applicant or operator on record is Thames Water Utilities. It is recorded as operational since December 2014. The determining authority is Newham, reference 12/01573/FUL.
π§ Technical Specifications
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Thames Water Utilities |
| Owner / operator | Thames Water Utilities |
| Year consented | 2013 |
| Construction started | 2014 |
| Commissioned / target | 2014 |
| Location | Beckton STW, Jenkins Lane, East Ham, London, IG11 0AD |
| Region | London |
| Coordinates | 51.5256348Β°N, 0.0799101Β°E |