Bioenergy / Waste

Beckton STW Biodiesel Power Plant

Beckton Sewage Treatment Works Jenkins Lane East Ham London, London, IG11 0AD

Beckton STW Biodiesel Power Plant is a 8 MW bioenergy / waste project in London. The applicant or operator on record is Balfour Beatty. It is recorded as operational since December 2010. The determining authority is Newham.…

Operational Β· Since 2010
Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2010 (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated 2012-05-29.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

8.000 MW
Registered Capacity
2010
Commissioned

πŸ“‹ Project Overview

Beckton STW Biodiesel Power Plant is a 8 MW bioenergy / waste project in London. The applicant or operator on record is Balfour Beatty. It is recorded as operational since December 2010. The determining authority is Newham.

πŸ”§ Technical Specifications

Capacity (MW)8.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBalfour Beatty
Owner / operatorBalfour Beatty
Commissioned / target2010
LocationBeckton Sewage Treatment Works Jenkins Lane East Ham London, London, IG11 0AD
RegionLondon
Coordinates51.5177768Β°N, 0.0934615Β°E

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2010-12-01