Solar Farm

Bayram Timber Limited, Gibson Lane South - Solar Panels

Bayram Timber Limited Gibson Lane South Melton, East Riding of Yorkshire, HU14 3HF

Bayram Timber Limited, Gibson Lane South - Solar Panels is a 1.7 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Footprint Zero. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority …

Consented / Approved
Project stageConsented
  1. PlanningFeb 2026 (completed)
  2. ConsentedApr 2026 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-05-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.700 MW
Registered Capacity

πŸ“‹ Project Overview

Bayram Timber Limited, Gibson Lane South - Solar Panels is a 1.7 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Footprint Zero. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is East Riding of Yorkshire, reference 26/00355/PVNOT.

Site Schematic

SUBSTATION ? ha Β· 1.7 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.700 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFootprint Zero
Owner / operatorFootprint Zero
Year consented2026
LocationBayram Timber Limited Gibson Lane South Melton, East Riding of Yorkshire, HU14 3HF
RegionYorkshire and Humber
Coordinates53.7112692Β°N, 0.5373124Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2026-02-11
2026-04-08