Lands Located Approximately 245m E. of No 164 Dooish Rd. and, Approximately 26m, Drumquin, Omagh, BT78 4RE
Battery Energy Storage System Development in Drumquin is a 87.8 MW battery storage project in Northern Ireland. The applicant or operator on record is Lightsource Renewable Energy Ireland Limited. The scheme is currently in the planning system, submitted November 2024. The determβ¦
In Planning
Project stageIn planning
PlanningNov 2024 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2025-01-20.
Registered planning capacity; not measured generation.
Battery Energy Storage System Development in Drumquin is a 87.8 MW battery storage project in Northern Ireland. The applicant or operator on record is Lightsource Renewable Energy Ireland Limited. The scheme is currently in the planning system, submitted November 2024. The determining authority is Fermanagh and Omagh, reference LA10/2024/1111/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
87.800 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Lightsource Renewable Energy Ireland Limited
Owner / operator
Lightsource Renewable Energy Ireland Limited
Location
Lands Located Approximately 245m E. of No 164 Dooish Rd. and, Approximately 26m, Drumquin, Omagh, BT78 4RE