Solar Farm

Bassingbourn Solar Farm

Land adjacent Highfield Farm, Bassingbourn, Cambridge, Cambridgeshire

Bassingbourn Solar Farm is a 14.4 MW solar farm project in Eastern. The applicant or operator on record is Push Energy. It is recorded as operational since March 2015. The determining authority is South Cambridgeshire, reference S/0098/14/FL.…

Operational Β· Since 2015
Project stageOperating
  1. PlanningJan 2014 (completed)
  2. ConsentedAug 2014 (completed)
  3. ConstructionOct 2014 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated 2015-04-28.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

14.400 MW
Registered Capacity
2015
Commissioned

πŸ“‹ Project Overview

Bassingbourn Solar Farm is a 14.4 MW solar farm project in Eastern. The applicant or operator on record is Push Energy. It is recorded as operational since March 2015. The determining authority is South Cambridgeshire, reference S/0098/14/FL.

Site Schematic

SUBSTATION ? ha Β· 14.4 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)14.400 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPush Energy
Owner / operatorPush Energy
Year consented2014
Construction started2014
Commissioned / target2015
LocationLand adjacent Highfield Farm, Bassingbourn, Cambridge, Cambridgeshire
RegionEastern
Coordinates52.070051Β°N, 0.0423109Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)259000

πŸ“… Project Timeline

2014-01-17
2014-08-29
2014-10-01
2015-03-31