Solar Farm

Barvills Solar Farm

Barvills Farm, Princess Margaret Road, East Tilbury, Tilbury, Essex, RM18 8PA

Barvills Solar Farm is a 11.6 MW solar farm project in Eastern. The applicant or operator on record is Barvills Solar Limited (BE Renewables). The scheme is currently in the planning system, submitted October 2014. The determining authority is Thurrock, reference 14/01124/FUL.…

Revised
Project stageSuperseded by a new application
  1. PlanningOct 2014 (completed)
  2. Superseded by a new application (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2015-05-28.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

11.600 MW
Registered Capacity

πŸ“‹ Project Overview

Barvills Solar Farm is a 11.6 MW solar farm project in Eastern. The applicant or operator on record is Barvills Solar Limited (BE Renewables). The scheme is currently in the planning system, submitted October 2014. The determining authority is Thurrock, reference 14/01124/FUL.

Site Schematic

SUBSTATION ? ha Β· 11.6 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)11.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBarvills Solar Limited (BE Renewables)
Owner / operatorBarvills Solar Limited (BE Renewables)
LocationBarvills Farm, Princess Margaret Road, East Tilbury, Tilbury, Essex, RM18 8PA
RegionEastern
Coordinates51.4722008Β°N, 0.4221974Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Are they re-applying (New REPD Ref)5942
Solar Site Area (sqm)75810

πŸ“… Project Timeline

2014-10-21