π Project Overview
Barton Renewable Energy Plant is a 20 MW bioenergy / waste project in North West. The applicant or operator on record is Peel Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Trafford, reference 76153/FULL/2010.
π§ Technical Specifications
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Peel Energy |
| Owner / operator | Peel Energy |
| Year consented | 2013 |
| Location | south side of the Manchester Ship Canal, Greater Manchester |
| Region | North West |
| Coordinates | 53.4686336Β°N, 2.3696627Β°W |
Additional published register fields
| Registered technology | Biomass (dedicated) |
|---|