Home Farm, Barlow Road, Barlow, Selby, North Yorkshire, YO8 8FX
Barlow Road, Barlow Road - Battery Storage is a 80 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is Vox Energy Limited. The application has been withdrawn or the scheme abandoned. The determining authority is North Yorkshire, reference ZGβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2023 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2025-03-04.
Registered planning capacity; not measured generation.
Barlow Road, Barlow Road - Battery Storage is a 80 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is Vox Energy Limited. The application has been withdrawn or the scheme abandoned. The determining authority is North Yorkshire, reference ZG2023/0720/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
80.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Vox Energy Limited
Owner / operator
Vox Energy Limited
Location
Home Farm, Barlow Road, Barlow, Selby, North Yorkshire, YO8 8FX