Balfour Beatty Rail Plant, Old Railway Works - Solar PV is a 0.26 MW solar farm project in South East. The applicant or operator on record is Balfour Beatty Group Limited Head Office. The planning application was refused. The determining authority is Ashford, reference NOT/2025/1β¦
Refused
Project stageRefused
PlanningSep 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2026-01-06.
Registered planning capacity; not measured generation.
Balfour Beatty Rail Plant, Old Railway Works - Solar PV is a 0.26 MW solar farm project in South East. The applicant or operator on record is Balfour Beatty Group Limited Head Office. The planning application was refused. The determining authority is Ashford, reference NOT/2025/1675.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.