340M SW Of Balblair Quarry Balblair Beauly, Highland, IV4 7BG
Balblair Quarry, Balblair - Battery Energy Storeage System is a 49.9 MW battery storage project in Scotland. The applicant or operator on record is Lovat Estates Limited (LG-B-50a Limited). Planning permission has been granted as of May 2025 and it is awaiting construction. The dβ¦
Consented / Approved
Project stageConsented
PlanningApr 2024 (completed)
ConsentedMay 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-06-18.
Registered planning capacity; not measured generation.
Balblair Quarry, Balblair - Battery Energy Storeage System is a 49.9 MW battery storage project in Scotland. The applicant or operator on record is Lovat Estates Limited (LG-B-50a Limited). Planning permission has been granted as of May 2025 and it is awaiting construction. The determining authority is Highland, reference 24/01548/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Lovat Estates Limited (LG-B-50a Limited)
Owner / operator
Lovat Estates Limited (LG-B-50a Limited)
Year consented
2025
Location
340M SW Of Balblair Quarry Balblair Beauly, Highland, IV4 7BG