π Project Overview
Baker Perkins, Manor Drive - Solar Panels is a 1.2 MW solar farm project in Eastern. The applicant or operator on record is Power Zero Limited. Planning permission has been granted as of September 2025 and it is awaiting construction. The determining authority is Peterborough, reference 25/00920/PRIOR.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 1 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Power Zero Limited |
| Owner / operator | Power Zero Limited |
| Year consented | 2025 |
| Location | Baker Perkins Ltd Manor Drive Gunthorpe, Cambridgeshire, PE4 7AP |
| Region | Eastern |
| Coordinates | 52.6128647Β°N, 0.2427874Β°W |