Ayton Mains Farmhouse - Wind Turbines is a 0.16 MW onshore wind project in Scotland. The applicant or operator on record is Constantine Group Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Scottish Borders, reference 23/01904/FULβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJan 2024 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2024-04-12.
Registered planning capacity; not measured generation.
Ayton Mains Farmhouse - Wind Turbines is a 0.16 MW onshore wind project in Scotland. The applicant or operator on record is Constantine Group Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Scottish Borders, reference 23/01904/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.