Solar Farm

Avro Way - Solar Array

30 Avro Way, Brooklands Industrial Park, Weybridge, Surrey, KT13 0XQ

Avro Way - Solar Array is a 0.2 MW solar farm project in South East. The applicant or operator on record is Vodafone Limited. The scheme is currently in the planning system, submitted August 2021. The determining authority is Elmbridge, reference 2021/2632.…

Revised
Project stageSuperseded by a new application
  1. PlanningAug 2021 (completed)
  2. Superseded by a new application (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2021-11-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.200 MW
Registered Capacity

πŸ“‹ Project Overview

Avro Way - Solar Array is a 0.2 MW solar farm project in South East. The applicant or operator on record is Vodafone Limited. The scheme is currently in the planning system, submitted August 2021. The determining authority is Elmbridge, reference 2021/2632.

Site Schematic

SUBSTATION ? ha Β· 0.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperVodafone Limited
Owner / operatorVodafone Limited
Location30 Avro Way, Brooklands Industrial Park, Weybridge, Surrey, KT13 0XQ
RegionSouth East
Coordinates51.3470396Β°N, 0.4783361Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Are they re-applying (New REPD Ref)12991

πŸ“… Project Timeline

2021-08-23