πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Battery Storage

Avenue Power - Urban Reserve Flexible Energy Facility

Avenue Power, Eastern Avenue Industrial Estate, Eastern Avenue, Dunstable, Bedfordshire, LU5 4JY

Avenue Power - Urban Reserve Flexible Energy Facility is a 5 MW battery storage project in Eastern. The applicant or operator on record is AMP Energy Services Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Central Bedfordshire, r…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJan 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2022-02-28.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Power Capacity

πŸ“‹ Project Overview

Avenue Power - Urban Reserve Flexible Energy Facility is a 5 MW battery storage project in Eastern. The applicant or operator on record is AMP Energy Services Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Central Bedfordshire, reference CB/21/05568/FULL.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW
Battery chemistryStand-alone Storage

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAMP Energy Services Limited
Owner / operatorAMP Energy Services Limited
LocationAvenue Power, Eastern Avenue Industrial Estate, Eastern Avenue, Dunstable, Bedfordshire, LU5 4JY
RegionEastern
Coordinates51.8870141Β°N, 0.5088912Β°W

Additional published register fields

Registered technologyBattery

πŸ“… Project Timeline

2022-01-11