Avenue Power - Urban Reserve Flexible Energy Facility is a 5 MW battery storage project in Eastern. The applicant or operator on record is AMP Energy Services Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Central Bedfordshire, rβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJan 2022 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2022-02-28.
Registered planning capacity; not measured generation.
Avenue Power - Urban Reserve Flexible Energy Facility is a 5 MW battery storage project in Eastern. The applicant or operator on record is AMP Energy Services Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Central Bedfordshire, reference CB/21/05568/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.