Aven Industrial Estate, Tickhill Road, Maltby, South Yorkshire, S66 7QR
Aven Industrial Estate is a 20 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is Max Design Consultancy. The planning permission has expired. The determining authority is Rotherham, reference RB2017/0910.β¦
Expired
Project stageConsent lapsed
PlanningJun 2017 (completed)
ConsentedJun 2018 (completed)
Consent lapsed (project stopped here)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Expired.
Official register: July 2026
Recorded status: Planning Permission Expired. Source record updated 2020-06-04.
Registered planning capacity; not measured generation.
Aven Industrial Estate is a 20 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is Max Design Consultancy. The planning permission has expired. The determining authority is Rotherham, reference RB2017/0910.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Max Design Consultancy
Owner / operator
Max Design Consultancy
Year consented
2018
Location
Aven Industrial Estate, Tickhill Road, Maltby, South Yorkshire, S66 7QR