Site to North West of Bankend Farm, Saltcoats, Ayrshire
Auld Clay is a 9.2 MW onshore wind project in Scotland. The applicant or operator on record is Amec Foster Wheeler. The planning application was refused. The determining authority is North Ayrshire, reference 15/00221/PP.β¦
Refused
Project stageRefused
PlanningApr 2015 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2015-10-06.
Registered planning capacity; not measured generation.
Auld Clay is a 9.2 MW onshore wind project in Scotland. The applicant or operator on record is Amec Foster Wheeler. The planning application was refused. The determining authority is North Ayrshire, reference 15/00221/PP.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
9.200 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Amec Foster Wheeler
Owner / operator
Amec Foster Wheeler
Location
Site to North West of Bankend Farm, Saltcoats, Ayrshire