Land 280M Se Of Torrdhuin, Auchterawe, Fort Augustus, Highlands, Highland, PH32 4BT
Auchteraw Energy Storage is a 20 MW battery storage project in Scotland. The applicant or operator on record is Shires Hamilton. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference 19/05385/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningDec 2019 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2023-01-05.
Registered planning capacity; not measured generation.
Auchteraw Energy Storage is a 20 MW battery storage project in Scotland. The applicant or operator on record is Shires Hamilton. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference 19/05385/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Shires Hamilton
Owner / operator
Shires Hamilton
Location
Land 280M Se Of Torrdhuin, Auchterawe, Fort Augustus, Highlands, Highland, PH32 4BT