Auchentiber Road, Port Glasgow, Kilmalcolm, Strathclyde, PA13 4SP
Auchentiber Road - Battery Energy Storage System is a 700 MW battery storage project in Scotland. The applicant or operator on record is Apatura GPC 700 Limited. Planning permission has been granted as of September 2024 and it is awaiting construction. The determining authority iβ¦
Consented / Approved
Project stageConsented
PlanningNov 2023 (completed)
ConsentedSep 2024 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2024-09-24.
Registered planning capacity; not measured generation.
Auchentiber Road - Battery Energy Storage System is a 700 MW battery storage project in Scotland. The applicant or operator on record is Apatura GPC 700 Limited. Planning permission has been granted as of September 2024 and it is awaiting construction. The determining authority is Scottish Government (S36), reference ECU00004979.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
700.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Apatura GPC 700 Limited
Owner / operator
Apatura GPC 700 Limited
Year consented
2024
Location
Auchentiber Road, Port Glasgow, Kilmalcolm, Strathclyde, PA13 4SP