πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Atherton Way - Solar Panels

Rocal Limited, Atherton Way, Brigg,Β , Lincolnshire, DN20 8AR

Atherton Way - Solar Panels is a 0.24 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Rocal Limited. It is recorded as operational since December 2022. The determining authority is North Lincolnshire, reference PA/2022/705.…

Operational Β· Since 2022
0 MW
Installed Capacity
2022
Commissioned

πŸ“‹ Project Overview

Atherton Way - Solar Panels is a 0.24 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Rocal Limited. It is recorded as operational since December 2022. The determining authority is North Lincolnshire, reference PA/2022/705.

Site Schematic

SUBSTATION ? ha Β· 0.24 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRocal Limited
Owner / operatorRocal Limited
Year consented2023
Construction started2022
Commissioned / target2022
LocationRocal Limited, Atherton Way, Brigg,Β , Lincolnshire, DN20 8AR
RegionYorkshire and Humber
Coordinates53.5576458Β°N, 0.4981254Β°W

πŸ“… Project Timeline