Solar Farm

Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System

Astral Green, S/O Leighton Road And N/O The A505, Stanbridge, Leighton Buzzard, Bedfordshire, LU7 9BL

Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System is a 2.09 MW solar farm project in Eastern. The applicant or operator on record is Arnold White Estates Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The det…

Consented / Approved
2 MW
Installed Capacity

πŸ“‹ Project Overview

Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System is a 2.09 MW solar farm project in Eastern. The applicant or operator on record is Arnold White Estates Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is Central Bedfordshire, reference CB/23/03278/FULL.

Site Schematic

SUBSTATION ? ha Β· 2.09 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperArnold White Estates Limited
Owner / operatorArnold White Estates Limited
Year consented2024
LocationAstral Green, S/O Leighton Road And N/O The A505, Stanbridge, Leighton Buzzard, Bedfordshire, LU7 9BL
RegionEastern
Coordinates51.8939969Β°N, 0.6329888Β°W