π Project Overview
Astral Green - Wind Turbine, Solar Array & Battery Energy Storage System is a 2.09 MW solar farm project in Eastern. The applicant or operator on record is Arnold White Estates Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is Central Bedfordshire, reference CB/23/03278/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 2 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Arnold White Estates Limited |
| Owner / operator | Arnold White Estates Limited |
| Year consented | 2024 |
| Location | Astral Green, S/O Leighton Road And N/O The A505, Stanbridge, Leighton Buzzard, Bedfordshire, LU7 9BL |
| Region | Eastern |
| Coordinates | 51.8939969Β°N, 0.6329888Β°W |