πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Battery Storage

Aston Road, Aston - Solar Panels & Battery Energy Storage System

West of Aston Road, Aston, Oxfordshire, OX18 2EU

Aston Road, Aston - Solar Panels & Battery Energy Storage System is a 40 MW battery storage project in South East. The applicant or operator on record is Ampyr Solar Europe. The scheme is currently in the planning system, submitted July 2025. The determining authority is West Oxf…

In Planning
Project stageIn planning
  1. PlanningJul 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2025-09-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

40.000 MW
Power Capacity

πŸ“‹ Project Overview

Aston Road, Aston - Solar Panels & Battery Energy Storage System is a 40 MW battery storage project in South East. The applicant or operator on record is Ampyr Solar Europe. The scheme is currently in the planning system, submitted July 2025. The determining authority is West Oxfordshire, reference 25/01702/FUL.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)40.000 MW
Battery chemistryCo-located with RE

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAmpyr Solar Europe
Owner / operatorAmpyr Solar Europe
LocationWest of Aston Road, Aston, Oxfordshire, OX18 2EU
RegionSouth East
Coordinates51.7378885Β°N, 1.5099203Β°W

Additional published register fields

Registered technologyBattery
Storage Co-location REPD Ref ID18920

πŸ“… Project Timeline

2025-07-25