Aston Grange Farm,
Acton Bridge
, Cheshire, Cheshire
Aston Grange Farm is a 12 MW onshore wind project in North West. The applicant or operator on record is Tegni Cymru. The planning application was refused. The determining authority is Cheshire West and Chester, reference 05-1059-fum.β¦
Refused
Project stageRefused
PlanningJun 2005 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2011-11-28.
Registered planning capacity; not measured generation.
Aston Grange Farm is a 12 MW onshore wind project in North West. The applicant or operator on record is Tegni Cymru. The planning application was refused. The determining authority is Cheshire West and Chester, reference 05-1059-fum.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
12.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Tegni Cymru
Owner / operator
Tegni Cymru
Location
Aston Grange Farm,
Acton Bridge
, Cheshire, Cheshire