π Project Overview
Aston Grange, Aston - Solar Panels & Battery Energy Storage System is a 6 MW battery storage project in North West. The applicant or operator on record is Innova Renewables. The scheme is currently in the planning system, submitted February 2025. The determining authority is Cheshire West and Chester, reference 25/00100/FULEIA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 6 MW |
| Battery chemistry | Co-located with RE |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Innova Renewables |
| Owner / operator | Innova Renewables |
| Location | Aston Grange, Aston, Runcorn, Cheshire, WA7 3DG |
| Region | North West |
| Coordinates | 53.2952808Β°N, 2.6522924Β°W |