LAND SOUTH OF WILLOW FARM, ASSERBY ROAD, ASSERBY, Lincolnshire
Asserby wind farm is a 10 MW onshore wind project in East Midlands. The applicant or operator on record is Energiekontor UK. The planning application was refused. The determining authority is East Lindsey, reference N/016/01046/14.β¦
Refused
Project stageRefused
PlanningJun 2014 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2015-06-29.
Registered planning capacity; not measured generation.
Asserby wind farm is a 10 MW onshore wind project in East Midlands. The applicant or operator on record is Energiekontor UK. The planning application was refused. The determining authority is East Lindsey, reference N/016/01046/14.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
10.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Energiekontor UK
Owner / operator
Energiekontor UK
Location
LAND SOUTH OF WILLOW FARM, ASSERBY ROAD, ASSERBY, Lincolnshire