Ashford Road, Kingsnorth - Energy Storage Facility is a 0.2 MW battery storage project in South East. The applicant or operator on record is AMP Clean Energy. Planning permission has been granted as of January 2025 and it is awaiting construction. The determining authority is Ashford, reference PA/2024/2022.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
| Battery chemistry | Stand-alone Storage |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | AMP Clean Energy |
| Owner / operator | AMP Clean Energy |
| Year consented | 2025 |
| Location | East of 1 Ellingham Industrial Centre, Ellingham Way, Kent, TN23 6LZ |
| Region | South East |
| Coordinates | 51.1286541Β°N, 0.8638407Β°E |