High Dike Road Londonthorpe, Lincolnshire, NG31 9ER
Ash Tree Solar Farm & Battery Storage is a 49.9 MW solar farm project in East Midlands. The applicant or operator on record is Low Carbon Limited. Planning permission has been granted as of July 2025 and it is awaiting construction. The determining authority is South Kesteven, reβ¦
Consented / Approved
Project stageConsented
PlanningNov 2023 (completed)
ConsentedJul 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Appeal Granted.
Official register: July 2026
Recorded status: Appeal Granted. Source record updated 2026-02-27.
Registered planning capacity; not measured generation.
Ash Tree Solar Farm & Battery Storage is a 49.9 MW solar farm project in East Midlands. The applicant or operator on record is Low Carbon Limited. Planning permission has been granted as of July 2025 and it is awaiting construction. The determining authority is South Kesteven, reference S23/2199.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Low Carbon Limited
Owner / operator
Low Carbon Limited
Year consented
2025
Location
High Dike Road Londonthorpe, Lincolnshire, NG31 9ER