πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Ash Tree Solar Farm & Battery Storage

High Dike Road Londonthorpe, Lincolnshire, NG31 9ER

Ash Tree Solar Farm & Battery Storage is a 49.9 MW solar farm project in East Midlands. The applicant or operator on record is Low Carbon Limited. Planning permission has been granted as of July 2025 and it is awaiting construction. The determining authority is South Kesteven, re…

Consented / Approved
Project stageConsented
  1. PlanningNov 2023 (completed)
  2. ConsentedJul 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Appeal Granted.

Official register: July 2026

Recorded status: Appeal Granted. Source record updated 2026-02-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.900 MW
Registered Capacity

πŸ“‹ Project Overview

Ash Tree Solar Farm & Battery Storage is a 49.9 MW solar farm project in East Midlands. The applicant or operator on record is Low Carbon Limited. Planning permission has been granted as of July 2025 and it is awaiting construction. The determining authority is South Kesteven, reference S23/2199.

Site Schematic

SUBSTATION ? ha Β· 49.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLow Carbon Limited
Owner / operatorLow Carbon Limited
Year consented2025
LocationHigh Dike Road Londonthorpe, Lincolnshire, NG31 9ER
RegionEast Midlands
Coordinates52.9117641Β°N, 0.5822643Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID15397
CfD Allocation RoundAR7a
CfD Capacity (MW)33
Mounting Type for SolarGround
Solar Site Area (sqm)1441400

πŸ“… Project Timeline

2023-11-29
2025-07-18