Armstrong Logistics Magna Park Unit 2400 Wellington Parkway, Leicestershire, LE17 4XW
Armstrong Logistics, Wellington Parkway - Solar panels is a 0.53 MW solar farm project in East Midlands. The applicant or operator on record is ABRDN (Investments Trust/Standard Life). Planning permission has been granted as of November 2023 and it is awaiting construction. The dβ¦
Consented / Approved
Project stageConsented
PlanningSep 2023 (completed)
ConsentedNov 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-11-09.
Registered planning capacity; not measured generation.
Armstrong Logistics, Wellington Parkway - Solar panels is a 0.53 MW solar farm project in East Midlands. The applicant or operator on record is ABRDN (Investments Trust/Standard Life). Planning permission has been granted as of November 2023 and it is awaiting construction. The determining authority is Harborough, reference 23/01374/PDN.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.530 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
ABRDN (Investments Trust/Standard Life)
Owner / operator
ABRDN (Investments Trust/Standard Life)
Year consented
2023
Location
Armstrong Logistics Magna Park Unit 2400 Wellington Parkway, Leicestershire, LE17 4XW