Milton End Farm Arlingham, Gloucestershire, GL2 7JH
Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility is a 49.9 MW solar farm project in South West. The applicant or operator on record is Kronos Solar. The application has been withdrawn or the scheme abandoned. The determining authority is Stroud, reference S.22/13β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJun 2022 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2021-03-16.
Registered planning capacity; not measured generation.
Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility is a 49.9 MW solar farm project in South West. The applicant or operator on record is Kronos Solar. The application has been withdrawn or the scheme abandoned. The determining authority is Stroud, reference S.22/1371/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Kronos Solar
Owner / operator
Kronos Solar
Location
Milton End Farm Arlingham, Gloucestershire, GL2 7JH