πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Arleston Solar & Battery Energy Storage System

Manor Farm, Arleston Lane, Arleston, Derby, Derbyshire, DE73 7HN

Arleston Solar & Battery Energy Storage System is a 43 MW solar farm project in East Midlands. The applicant or operator on record is Noventum Power Limited. The scheme is currently in the planning system, submitted July 2025. The determining authority is South Derbyshire, refere…

In Planning
Project stageIn planning
  1. PlanningJul 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2025-09-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

43.000 MW
Registered Capacity

πŸ“‹ Project Overview

Arleston Solar & Battery Energy Storage System is a 43 MW solar farm project in East Midlands. The applicant or operator on record is Noventum Power Limited. The scheme is currently in the planning system, submitted July 2025. The determining authority is South Derbyshire, reference DMOT/2025/0113.

Site Schematic

SUBSTATION ? ha Β· 43 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)43.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperNoventum Power Limited
Owner / operatorNoventum Power Limited
LocationManor Farm, Arleston Lane, Arleston, Derby, Derbyshire, DE73 7HN
RegionEast Midlands
Coordinates52.8634374Β°N, 1.5006391Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID18142
Mounting Type for SolarGround
Solar Site Area (sqm)487700

πŸ“… Project Timeline

2025-07-02