πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Arleston Solar & Battery Energy Storage System

Manor Farm, Arleston Lane, Arleston, Derby, Derbyshire, DE73 7HN

Arleston Solar & Battery Energy Storage System is a 43 MW solar farm project in East Midlands. The applicant or operator on record is Noventum Power Limited. The scheme is currently in the planning system, submitted July 2025. The determining authority is South Derbyshire, refere…

In Planning
43 MW
Installed Capacity

πŸ“‹ Project Overview

Arleston Solar & Battery Energy Storage System is a 43 MW solar farm project in East Midlands. The applicant or operator on record is Noventum Power Limited. The scheme is currently in the planning system, submitted July 2025. The determining authority is South Derbyshire, reference DMOT/2025/0113.

Site Schematic

SUBSTATION ? ha Β· 43 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)43 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperNoventum Power Limited
Owner / operatorNoventum Power Limited
LocationManor Farm, Arleston Lane, Arleston, Derby, Derbyshire, DE73 7HN
RegionEast Midlands
Coordinates52.8634374Β°N, 1.5006391Β°W

πŸ“… Project Timeline