Ardtalnaig Hydro Scheme is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Achomer Energy. It is recorded as operational since July 2017. The determining authority is Perth and Kinross, reference 12/01113/FLL.…

Operational Β· Since 2017
Official register: July 2026

Recorded status: Operational. Source record updated 2017-11-21.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity
2017
Commissioned

πŸ“‹ Project Overview

Ardtalnaig Hydro Scheme is a 2 MW conventional hydro project in Scotland. The applicant or operator on record is Achomer Energy. It is recorded as operational since July 2017. The determining authority is Perth and Kinross, reference 12/01113/FLL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 2.000 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAchomer Energy
Owner / operatorAchomer Energy
Year consented2012
Construction started2015
Commissioned / target2017
LocationArdtalnaig, Aberfeldy, Tayside, Tayside
RegionScotland
Coordinates56.5255804Β°N, 4.1334734Β°W

Additional published register fields

Registered technologySmall Hydro
Are they re-applying (Old REPD Ref) 451

πŸ“… Project Timeline

2012-07-12
2012-12-03
2015-05-15
2017-07-15