Conventional Hydro

Ardgour Hydro

3100m Nw/O Sallachan Ardgour Fort William, Highland, PH33 7AB

Ardgour Hydro is a 0.55 MW conventional hydro project in Scotland. The applicant or operator on record is Corrigan Contractors Limited. The scheme is currently in the planning system, submitted April 2017. The determining authority is Highland, reference 17/01675/FUL.…

In Planning
1 MW
Installed Capacity

πŸ“‹ Project Overview

Ardgour Hydro is a 0.55 MW conventional hydro project in Scotland. The applicant or operator on record is Corrigan Contractors Limited. The scheme is currently in the planning system, submitted April 2017. The determining authority is Highland, reference 17/01675/FUL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 1 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCorrigan Contractors Limited
Owner / operatorCorrigan Contractors Limited
Location3100m Nw/O Sallachan Ardgour Fort William, Highland, PH33 7AB
RegionScotland
Coordinates56.7166054Β°N, 5.268643Β°W

πŸ“… Project Timeline