Amazon Unit 2 Symmetry Park Laines Way, Wiltshire, SN3 4DB
Amazon, Symmetry Park - Solar Panels is a 3.26 MW solar farm project in South West. The applicant or operator on record is Push Energy. Planning permission has been granted as of November 2022 and it is awaiting construction. The determining authority is Swindon, reference S/22/1β¦
Consented / Approved
Project stageConsented
PlanningSep 2022 (completed)
ConsentedNov 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-12-06.
Registered planning capacity; not measured generation.
Amazon, Symmetry Park - Solar Panels is a 3.26 MW solar farm project in South West. The applicant or operator on record is Push Energy. Planning permission has been granted as of November 2022 and it is awaiting construction. The determining authority is Swindon, reference S/22/1393.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
3.260 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Push Energy
Owner / operator
Push Energy
Year consented
2022