π Project Overview
Als Laboratories Uk, Manor Road - Solar PV Panels is a 0.53 MW solar farm project in Wales. The applicant or operator on record is ALS Limited. The scheme is currently in the planning system, submitted May 2023. The determining authority is Flintshire, reference ELC/000474/23.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0.530 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | ALS Limited |
| Owner / operator | ALS Limited |
| Location | Units 7-8, ALS Laboratories, Hawarden Business Park, Manor Lane, Hawarden, Deeside, Clwyd, CH5 3US |
| Region | Wales |
| Coordinates | 53.175095Β°N, 2.9914229Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Storage Co-location REPD Ref ID | |
| CfD Capacity (MW) | |
| Turbine Capacity (MW) | |
| No. of Turbines | |
| Height of Turbines (m) | |
| Mounting Type for Solar | Roof |
| Are they re-applying (New REPD Ref) | 14936 |
| Are they re-applying (Old REPD Ref) | |
| Solar Site Area (sqm) |