πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Alpha Grimsby Renewable Energy Centre

Land Off Energy Park Way Grimsby North East Lincolnshire DN31 2TT, Lincolnshire, DN31 2TT

Alpha Grimsby Renewable Energy Centre is a 18 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Alpha Grimsby Limited. The application has been withdrawn or the scheme abandoned. The determining authority is North East Lincolnshire, refe…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningFeb 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2022-10-21.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

18.000 MW
Registered Capacity

πŸ“‹ Project Overview

Alpha Grimsby Renewable Energy Centre is a 18 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Alpha Grimsby Limited. The application has been withdrawn or the scheme abandoned. The determining authority is North East Lincolnshire, reference DM/0039/21/FUL.

πŸ”§ Technical Specifications

Capacity (MW)18.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAlpha Grimsby Limited
Owner / operatorAlpha Grimsby Limited
LocationLand Off Energy Park Way Grimsby North East Lincolnshire DN31 2TT, Lincolnshire, DN31 2TT
RegionYorkshire and Humber
Coordinates53.5928693Β°N, 0.1337207Β°W

Additional published register fields

Registered technologyEfW Incineration

πŸ“… Project Timeline

2021-02-09