Allt Teanga Brideig, Uluvat, Isle of Mull, Strathclyde, Argyll And Bute, PA70 6HG
Allt Teanga Brideig, Uluvat - Hydro Electric Scheme is a 0.37 MW conventional hydro project in Scotland. The applicant or operator on record is Rossal Energy. Planning permission has been granted as of December 2024 and it is awaiting construction. The determining authority is Arβ¦
Consented / Approved
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-01-13.
Registered planning capacity; not measured generation.
Allt Teanga Brideig, Uluvat - Hydro Electric Scheme is a 0.37 MW conventional hydro project in Scotland. The applicant or operator on record is Rossal Energy. Planning permission has been granted as of December 2024 and it is awaiting construction. The determining authority is Argyll, Bute and South Lochaber, reference 24/01658/PP.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.370 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Rossal Energy
Owner / operator
Rossal Energy
Year consented
2024
Location
Allt Teanga Brideig, Uluvat, Isle of Mull, Strathclyde, Argyll And Bute, PA70 6HG