Allt Eilidh

Land 6500M SE Of Birch View, Duror, Auchindarroch, Appin, Strathclyde, Highland, PA38 4BS

Allt Eilidh is a 0.6 MW conventional hydro project in Scotland. The applicant or operator on record is Glen Creran Hydro. It is recorded as under construction since November 2019. The determining authority is Highland, reference 18/05850/FUL.…

Under Construction
1 MW
Installed Capacity

πŸ“‹ Project Overview

Allt Eilidh is a 0.6 MW conventional hydro project in Scotland. The applicant or operator on record is Glen Creran Hydro. It is recorded as under construction since November 2019. The determining authority is Highland, reference 18/05850/FUL.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 1 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGlen Creran Hydro
Owner / operatorGlen Creran Hydro
Year consented2019
Construction started2019
LocationLand 6500M SE Of Birch View, Duror, Auchindarroch, Appin, Strathclyde, Highland, PA38 4BS
RegionScotland
Coordinates56.6270219Β°N, 5.1532029Β°W

πŸ“… Project Timeline