π Project Overview
Allington Lane, West End - Solar panels is a 0.5 MW solar farm project in South East. The applicant or operator on record is Portsmouth Water. Planning permission has been granted as of November 2021 and it is awaiting construction. The determining authority is Eastleigh, reference PN/21/91711.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0.500 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Portsmouth Water |
| Owner / operator | Portsmouth Water |
| Year consented | 2021 |
| Location | Itchen Power Limited, Portsmouth Water, Allington Lane, West End, Southampton, Hampshire, SO30 3HQ |
| Region | South East |
| Coordinates | 50.9391725Β°N, 1.3427185Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Roof |