Land at Aller Farm, East of Woodford and North of Monnksilver, Williton, Somerset, TA4 4HH
Aller Farm is a 4.7 MW solar farm project in South West. The applicant or operator on record is TGC Renewables. The planning application was refused. The determining authority is Somerset, reference 3/28/14/005.β¦
Refused
Project stageRefused
PlanningSep 2014 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2016-02-05.
Registered planning capacity; not measured generation.
Aller Farm is a 4.7 MW solar farm project in South West. The applicant or operator on record is TGC Renewables. The planning application was refused. The determining authority is Somerset, reference 3/28/14/005.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
4.700 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
TGC Renewables
Owner / operator
TGC Renewables
Location
Land at Aller Farm, East of Woodford and North of Monnksilver, Williton, Somerset, TA4 4HH