Alfred G Pearce Castle Road, Wormegay, Norfolk, PE33 0SG
Alfred G Pearce, Castle Road - Solar Farm is a 0.73 MW solar farm project in Eastern. The applicant or operator on record is A G Pearce Limited. The planning application was refused. The determining authority is King's Lynn and West Norfolk, reference 22/02086/FM.β¦
Refused
Project stageRefused
PlanningNov 2022 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2024-04-02.
Registered planning capacity; not measured generation.
Alfred G Pearce, Castle Road - Solar Farm is a 0.73 MW solar farm project in Eastern. The applicant or operator on record is A G Pearce Limited. The planning application was refused. The determining authority is King's Lynn and West Norfolk, reference 22/02086/FM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.730 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
A G Pearce Limited
Owner / operator
A G Pearce Limited
Location
Alfred G Pearce Castle Road, Wormegay, Norfolk, PE33 0SG