Unit 1 ,Airways Distribution Park, Wide Lane, Southampton, Hampshire, SO18 2RT
Airways Distribution Park, Wide Lane, Unit 1 - Solar Panels is a 0.45 MW solar farm project in South East. The applicant or operator on record is Ineco Energy Limited. Planning permission has been granted as of January 2025 and it is awaiting construction. The determining authoriβ¦
Consented / Approved
Project stageConsented
PlanningDec 2024 (completed)
ConsentedJan 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-02-25.
Registered planning capacity; not measured generation.
Airways Distribution Park, Wide Lane, Unit 1 - Solar Panels is a 0.45 MW solar farm project in South East. The applicant or operator on record is Ineco Energy Limited. Planning permission has been granted as of January 2025 and it is awaiting construction. The determining authority is Southampton, reference 24/01511/PAPV.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.450 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Ineco Energy Limited
Owner / operator
Ineco Energy Limited
Year consented
2025
Location
Unit 1 ,Airways Distribution Park, Wide Lane, Southampton, Hampshire, SO18 2RT