Consented / Approved
Project stageConsented
PlanningJun 2025 (completed)
ConsentedSep 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-09-29.
Registered planning capacity; not measured generation.
Airport Gate Business Centre, Harmondsworth - Solar Panels is a 0.15 MW solar farm project in London. The applicant or operator on record is AIPUT Industrial GP Limited. Planning permission has been granted as of September 2025 and it is awaiting construction. The determining authority is Hillingdon, reference 58651/APP/2025/1765.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.150 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AIPUT Industrial GP Limited
Owner / operator
AIPUT Industrial GP Limited
Year consented
2025