π Project Overview
Airfield Farm - Solar Array is a 49.9 MW solar farm project in East Midlands. The applicant or operator on record is Engena Limited. The scheme is currently in the planning system, submitted February 2026. The determining authority is West Lindsey, reference WL/2026/00180.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 50 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Engena Limited |
| Owner / operator | Engena Limited |
| Location | Airfield Farm, North Kelsey Road, Caistor, Lincolnshire, LN7 6BF |
| Region | East Midlands |
| Coordinates | 53.4940149Β°N, 0.3556882Β°W |