Airfield Farm - AD is a 2 MW bioenergy / waste project in South West. The applicant or operator on record is Ylem Energy Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Cotswold, reference 13/04090/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2018-09-20.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

Airfield Farm - AD is a 2 MW bioenergy / waste project in South West. The applicant or operator on record is Ylem Energy Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Cotswold, reference 13/04090/FUL.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperYlem Energy Limited
Owner / operatorYlem Energy Limited
Year consented2013
LocationDown Ampney Airfield, Down Ampney, Cirencester,, Gloucestershire, GL7 5PL
RegionSouth West
Coordinates51.6698647Β°N, 1.8394465Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2013-09-20
2013-12-23